How Much Do Kids' Clothes Shrink After Twenty Washes
We washed our own kids' clothes twenty times and measured them. Shrinkage came to about 1–2cm, most of it in the first few wash...
Short answer: a small kids' clothing run gets made in five stages over about six to twelve weeks. Fabric is ordered against a specific capsule, cut and sewn end to end by one small team, then quality-checked piece by piece before the whole run ships to a single stockist. The process is slower and more hands-on than a factory production line, and it is the reason a small-batch garment costs what it does.
This is the honest walk-through, from the fabric arriving at the workroom door to the packing tape going on the last box.
Most of the extra work in a small-batch run lives in the last stage before packing. When a factory produces tens of thousands of pieces of one SKU, individual defects get absorbed into a return rate. When a workroom produces two hundred pieces of one SKU, every rejected garment is a visible dent in the count for that size.
So the checks are close. Each piece is turned inside out to look at seam allowance and stitch density on the stress points. Snaps and buttons are opened and closed to test the closing pressure. On our long-sleeve tops the shoulder seam gets a small tug to confirm the stitch holds. On the cargo jorts the pockets get their seam checked and the drawstring gets pulled to length. Anything that fails goes into a defect pile and gets either repaired or written off, and the count for that size is updated before the run is packed.
A small-batch run has its own set of process risks that a parent buying the finished garment does not usually see:
Not everything gets caught. What a small run does buy you is that the person who signed off on the checks is one call away from the person who made the piece.
If you want to see the process above in its finished form, our AW26 Capsule One is what came out of the last run. Capsule Two lands on 1 September 2026, produced the same way. Our free Australian shipping applies on any order over $150.
About six to twelve weeks in most cases, depending on fabric availability. Fabric ordering and dye-lot matching is the slowest part of the front end; the cutting and sewing then usually takes three to five weeks once the fabric is on the table.
Seams get pulled by hand at the stress points. Snaps and buttons get tested with a real closing pressure. Prints get inspected under light for streaks or misalignment. Anything that fails goes into a defect pile and either gets repaired or written off before the run is packed.
Because the run is only a few hundred garments across every size. A factory cut is spread across dozens of fabric layers stacked on a long table, which is faster per piece but only makes sense at high volume. A short-table cut is slower per garment and is where a chunk of the higher unit cost comes from.
Yes, and that is one of the reasons brands run small in the first place. Fit issues and construction details that only surface in wear can be corrected in the next capsule without writing off a huge inventory of the older version.
The cutting and sewing hours per garment are higher when the run is small, and every piece gets quality-checked by hand instead of by statistical sampling. Some of that cost gets absorbed by selling direct-to-consumer instead of through wholesalers, but some of it lands on the price tag.
Usually not much, because the fabric is ordered against the run and the buffer is small. Any real remainder gets used for sample garments for the next capsule or held for future repairs of the same run. Small brands prefer to under-order than to end up with metres of a colour they will not use again.
Stories, ideas and notes from Saint Toba.
We washed our own kids' clothes twenty times and measured them. Shrinkage came to about 1–2cm, most of it in the first few wash...
As of 10 September 2026, Capsule Two is still listed as PREORDER and still available to buy. Dispatch still follows the 4 to 6 ...
Yes. Saint Toba shows Afterpay on the storefront. Pay in 4 starts at checkout, while Capsule Two dispatch still follows the 4 t...